Two-fer Wednesday! # 5 and #6 in the Series
Allright.... I got a little behind on my posting of the building of the Kyle United Methodist Church fellowship hall. Here's the next 2 in the series. The steel for the frame came in about 9/12. The frame was begun on 9/26. So those are the dates for those two shots. It's really looking good. When I went to church this past Sunday it looked lie the entire frame was up. I'll have to grab my camera tonight and take a photo or two.
Click the photos to go backtrack and see the last post (from 9/23).
No comments:
Post a Comment